Project profiles fed by the WCSB S&D model leaves: live production charts, maintenance calendars, and market-relevance lines. All public information.

Every producing oil-sands project in the model, grouped by extraction method and operator. Live status is computed from the model's own maintenance math and forward calendar. Capacity figures are company or regulatory disclosures carried with their source; where sources disclose multiple capacity bases, all are shown on the profile. 'Not disclosed' means the reviewed public sources do not state a figure; nothing is estimated.

Mining (5)

Imperial Oil Resources Limited (1)

ProjectLive statusCapacityLatest actual kb/d12-mo fcst avg kb/d
KearlNo modeled maintenance in the forward window345,000 bbl/d of bitumen recorded as the capacity basis (regulatory approval;... (see profile)230.5 (May 2026)295.1

Suncor Energy Inc. (2)

ProjectLive statusCapacityLatest actual kb/d12-mo fcst avg kb/d
Fort HillsNo modeled maintenance in the forward windowAnnounced nameplate of 194,000 bbl/d of bitumen (Suncor-confirmed, 2018). Demonstrated... (see profile)163.8 (May 2026)184.5
Base PlantTurnaround in model: Nov 2026 (+15.0 kb/d, Suncor Base Plant Q4 bitumen maintenance)Upgrader capacity of 350,000 bbl/d of SCO. (see profile)232.8 (May 2026)262.1

Canadian Natural Resources Limited (1)

ProjectLive statusCapacityLatest actual kb/d12-mo fcst avg kb/d
HorizonTurnaround in model: Oct 2026 (+119.0 kb/d, Horizon 35-day turnaround)Mined-bitumen capacity of 314,000 bbl/d. (see profile)333.3 (May 2026)301.8

Syncrude Canada Ltd. (1)

ProjectLive statusCapacityLatest actual kb/d12-mo fcst avg kb/d
SyncrudeTurnaround in model: Oct 2026 (+10.1 kb/d, Syncrude Coker 8-2 mine dial-back)Gross SCO capacity of about 350,000 bbl/d. (see profile)153.1 (May 2026)170.6

In-situ (23)

Cenovus Energy Inc. (5)

ProjectLive statusCapacityLatest actual kb/d12-mo fcst avg kb/d
Foster CreekNo modeled maintenance in the forward windowNameplate capacity is 210,000 bbl/d of bitumen, after a debottlenecking/optimization... (see profile)310.7 (Jul 2026)279.5
Christina LakeTurnaround in model: Oct 2026 (+20.0 kb/d, Christina Lake F/G turnaround tail)Nameplate capacity of 260,000 bbl/d of bitumen, based on AER and facility-operator...403.8 (Jul 2026)357.7
SunriseNo modeled maintenance in the forward windowNameplate capacity of 60,000 bbl/d of bitumen at the time of the 2022 acquisition,...86.2 (Jul 2026)70.0
Narrows LakeNo modeled maintenance in the forward windowCompany guidance at sanction: 20,000 to 30,000 bbl/d via the 17-km tie-back, with...101.6 (Jul 2026)57.1
Christina Lake NorthPattern-indicated maintenance: May 2027 (indicator only, no volume in model math)MEG-era nameplate was reported at 100,000 bbl/d (Phase 1, 2, and 2B operations). Note:...no leafno leaf

Suncor Energy Inc. (2)

ProjectLive statusCapacityLatest actual kb/d12-mo fcst avg kb/d
FirebagPattern-indicated maintenance: May 2027 (indicator only, no volume in model math)Nameplate capacity of 215,000 bbl/d of bitumen, disclosed after completion of... (see profile)305.7 (Jul 2026)293.4
MacKay RiverPattern-indicated maintenance: Sep 2027 (indicator only, no volume in model math)The facility produces about 38,000 barrels of bitumen per day during normal... (see profile)41.7 (Jul 2026)41.6

Canadian Natural Resources Limited (3)

ProjectLive statusCapacityLatest actual kb/d12-mo fcst avg kb/d
JackfishNo modeled maintenance in the forward windowAnnounced nameplate capacity of 120,000 bbl/d of bitumen. The facility runs ABOVE... (see profile)128.8 (Jul 2026)137.3
KirbyNo modeled maintenance in the forward windowKirby South nameplate capacity of 40,000 bbl/d; Kirby North nameplate capacity of...70.1 (Jul 2026)72.3
Primrose and Wolf LakePattern-indicated maintenance: Apr 2027 (indicator only, no volume in model math)Nameplate capacity of 140,000 bbl/d of bitumen, including the original Wolf Lake...113.5 (Jul 2026)99.9

ConocoPhillips Canada Resources Corp. (1)

ProjectLive statusCapacityLatest actual kb/d12-mo fcst avg kb/d
SurmontNo modeled maintenance in the forward windowAnnounced nameplate of 136,000 bbl/d of bitumen (ConocoPhillips, Q3 2014)....167.8 (Jul 2026)185.7

Athabasca Oil Corporation (2)

ProjectLive statusCapacityLatest actual kb/d12-mo fcst avg kb/d
LeismerPattern-indicated maintenance: May 2027 (indicator only, no volume in model math)Expansion targets 40,000 bbl/d of production by end of 2027, on a ~$300 million...32.6 (Jul 2026)35.6
HangingstoneNo modeled maintenance in the forward windowPhase 1 production capacity of 12,000 bbl/d of bitumen. (see profile)11.9 (Jul 2026)11.3

Greenfire Resources Operating Corporation (2)

ProjectLive statusCapacityLatest actual kb/d12-mo fcst avg kb/d
Hangingstone ExpansionNo modeled maintenance in the forward windowThe expansion site has capacity for 35,000 bbl/d of bitumen. It achieved first oil on... (see profile)23.3 (Jul 2026)22.7
Great DivideNo modeled maintenance in the forward windownot disclosed in reviewed sources25.3 (Jul 2026)24.6

Strathcona Resources Ltd. (3)

ProjectLive statusCapacityLatest actual kb/d12-mo fcst avg kb/d
OrionNo modeled maintenance in the forward windownot disclosed in reviewed sources28.4 (Jul 2026)28.4
LindberghNo modeled maintenance in the forward windownot disclosed in reviewed sources25.4 (Jul 2026)20.0
TuckerNo modeled maintenance in the forward windownot disclosed in reviewed sources28.9 (Jul 2026)30.4

Harvest Operations Corp. (1)

ProjectLive statusCapacityLatest actual kb/d12-mo fcst avg kb/d
BlackGoldNo modeled maintenance in the forward windowPhase 1 design capacity of 10,000 bbl/d of bitumen; nameplate bitumen production was...13.4 (Jul 2026)11.1

Ipc Canada Ltd. (1)

ProjectLive statusCapacityLatest actual kb/d12-mo fcst avg kb/d
BlackrodNo modeled maintenance in the forward windowRegulatory approval covers up to 80,000 bbl/d. Phase 1 was sanctioned in Q1 2023 for a...5.0 (Jul 2026)16.6

PetroChina Canada Ltd. (1)

ProjectLive statusCapacityLatest actual kb/d12-mo fcst avg kb/d
MacKay River (PetroChina)No modeled maintenance in the forward windowPhase 1 capacity is cited at 35,000 bbl/d, with an ultimate phased target of 150,000...11.9 (Jul 2026)10.3

Imperial Oil Resources Limited (1)

ProjectLive statusCapacityLatest actual kb/d12-mo fcst avg kb/d
Cold LakeTurnaround in model: Oct 2026 (+3.0 kb/d, Imperial Cold Lake 3Q/4Q 2026 turnaround)2026 production guidance of 152,000 to 160,000 bbl/d (gross). This is a guidance...194.3 (Jul 2026)199.5

Canadian Natural Upgrading Limited (1)

ProjectLive statusCapacityLatest actual kb/d12-mo fcst avg kb/d
Peace RiverNo modeled maintenance in the forward windowPlant capacity of 12,500 bbl/d of bitumen. Note: secondary-sourced.4.4 (Jul 2026)3.7

Upgrading (1)

CNOOC Petroleum North America ULC (1)

ProjectLive statusCapacityLatest actual kb/d12-mo fcst avg kb/d
Long Lake UpgraderNo production leaf in the modelSAGD design bitumen capacity of 11,130 m3/d, i.e., 70,000 bbl/d; steam capacity of... (see profile)no leafno leaf
Heavy Reading · the WCSB supply letter.
Public information only: AER ST3/ST39/ST53 and company disclosures via the WCSB S&D model. Nothing here is licensed data, so this page renders the same with or without ?public=1.