Projects / Horizon

Horizon

Canadian Natural Resources Limited
Turnaround in model: Oct 2026 (+119.0 kb/d, Horizon 35-day turnaround)Integrated (mine + upgrader)CNQ

OperatorCanadian Natural Resources Limited
TypeIntegrated (mine + upgrader)
TickerCNQ
ST53 schemenot in ST53
DescriptionHorizon is an integrated oil sands mining and upgrading project north of Fort McMurray. Mined bitumen is upgraded on site to synthetic crude oil (SCO). Canadian Natural reports three distinct capacity bases for Horizon: mined-bitumen capacity, operating SCO capacity, and regulatory SCO nameplate. These are different figures and must not be mixed.
Source: Oil Sands Magazine, CNRL Horizon Mine project profile, 2026-09-23
Source: Canadian Natural Resources Limited, Q1 2025 interim report, 2025-05-08
StatusOperating. The NRUTT (Naphtha Recovery Unit Tailings Treatment) project is sanctioned with a Q3 2027 in-service target.
Source: BOE Report, Canadian Natural Resources Limited announces 2026 budget, 2025-12-16
Nameplate capacityMined-bitumen capacity of 314,000 bbl/d.
Source: Oil Sands Magazine, CNRL Horizon Mine project profile, 2026-09-23

SCO operating capacity of 264,000 bbl/d, following the 2024 Reliability Enhancement Project.
Source: Canadian Natural Resources Limited, Q1 2025 interim report, 2025-05-08

Regulatory SCO nameplate of 271,000 bbl/d. Note: secondary-sourced.
Source: Oil Sands Magazine, 2026 production forecast: oil sands mining and upgrading, 2026-01-15

Demonstrated peaks exceed all three stated bases: 309,800 bbl/d SCO in November 2025 and 333,300 bbl/d mined bitumen in May 2026 (AER ST39, "CNRL HORIZON OIL SANDS PROJECT", Production). The model's capacity reference for headroom/utilization math uses these demonstrated peaks; the three stated bases are recorded as stated. Per the standing rule, where actuals beat announced capacity, history wins. Mine-bitumen capacity and upgrader SCO capacity are kept as separate lines, never blended.
Start-up / phasesnot tracked in the public data used here
Ownership / JV splitCanadian Natural Resources Limited owns 100% of the Horizon mine and upgrader and is the operator. Canadian Natural acquired the remaining working interests in the Athabasca Oil Sands Project assets from Shell and Marathon, and since March 1, 2025 it holds 100% of the Albian mines (Jackpine and Muskeg River). It also holds an 80% non-operated interest in the Scotford Upgrader (Shell 20%, operator), a separate upgrading asset.
Source: Canadian Natural Resources Limited, acquisition announcement, via BOE Report, 2017-03-09
Product and dispositionSCO from the upgrader; mined bitumen to the upgrader (froth treatment NFT: upgrader-locked, cannot meet pipeline dilbit spec)
Source: annotations/maintenance_disposition_history.md
Process / technologyOpen-pit mining with naphtha froth treatment (NFT); mined bitumen is upgrader-locked and is upgraded on site to SCO. Note: NFT classification is secondary-sourced research.
Source: project technology research compilation, 2026-09-23
Froth treatmentNFT (naphthenic froth treatment): upgrader-locked
Source: annotations/maintenance_disposition_history.md
Interconnectsnot tracked in the public data used here
Growth / expansionsThe NRUTT (Naphtha Recovery Unit Tailings Treatment) project targets an incremental 6,300 bbl/d of SCO in Q3 2027. APPLIED 2026-09-23 (the editor): +6.3 kb/d step change on the Horizon SCO leaf for Jul-Sep 2027 (the Q3/27 months in the Oct 2026-Sep 2027 forecast window); step change, not a ramp. The previously flagged implied ~277,300 bbl/d post-NRUTT nameplate is moot: demonstrated ST39 peak is 309.8 kb/d SCO (2025-11) and history wins per the standing rule, so only the +6.3 increment is modeled. (Source: Canadian Natural Resources Limited, "Canadian Natural Resources Limited Announces 2026 Budget", 2025-12-16: "At Horizon, the Company is progressing its Naphtha Recovery Unit Tailings Treatment ("NRUTT") project that targets incremental production in Q3/27 of approximately 6,300 bbl/d of SCO following mechanical completion."; verbatim company release text via newswire mirrors including https://www.advfn.com/stock-market/TSX/CNQ/stock-news/97449467/canadian-natural-resources-limited-announces-2026)
In November 2025 Canadian Natural unveiled over $15 billion in oil sands expansion plans; project-level allocation to Horizon was not detailed in the reviewed summary.
Source: Oil Sands Magazine, 2025-11-11, referenced in the Peace River project profile, accessed 2026-09-23, https://www.oilsandsmagazine.com/projects/cnrl-peace-river
Company-disclosed maintenanceA 35-day turnaround begins September 2026, with an annual-average impact of 29,000 bbl/d. The turnaround runs on a two-year cycle, with the next one targeted for 2028.
Source: BOE Report, Canadian Natural Resources Limited announces 2026 budget, 2025-12-16
Operating costsOil Sands Mining and Upgrading operating cost of C$21.88/bbl of SCO in Q1 2025 (segment basis covering Horizon, not project-allocated).
Source: Canadian Natural Resources Limited, Q1 2025 interim report, 2025-05-08

Blank "not tracked" cells are facts not present in the public data used here. They are labeled, never estimated. Filing-sourced facts carry their document name and date; where sources disclose multiple bases for one figure, all are shown.

Production

333.3 kb/d
latest actual, May 2026 (Horizon (CNRL))
301.8 kb/d
12-month forecast average, Oct 2026 to Sep 2027
Horizon (CNRL) monthly production Horizon (CNRL) monthly production kb/d 0.0 125.0 250.0 375.0 500.0 Aug 25: 302.4 kb/d Sep 25: 324.9 kb/d Oct 25: 316.6 kb/d Nov 25: 324.5 kb/d Dec 25: 322.8 kb/d Jan 26: 305.7 kb/d Feb 26: 303.9 kb/d Mar 26: 287.1 kb/d Apr 26: 313.3 kb/d May 26: 333.3 kb/d Aug 26: 324.0 kb/d Sep 26: 106.2 kb/d Oct 26: 217.9 kb/d Nov 26: 345.6 kb/d Dec 26: 348.1 kb/d Jan 27: 295.6 kb/d Feb 27: 310.3 kb/d Mar 27: 318.7 kb/d Apr 27: 337.9 kb/d May 27: 206.4 kb/d Jun 27: 242.5 kb/d Jul 27: 338.6 kb/d Aug 27: 324.0 kb/d Sep 27: 336.2 kb/d 336.2 Aug 25 Oct 25 Dec 25 Feb 26 Apr 26 Jun 26 Aug 26 Oct 26 Dec 26 Feb 27 Apr 27 Jun 27 Aug 27 Sep 27
Vintage: AER ST53 actuals through 2026-07 (ST39 through 2026-05), pulled 2026-09-22; Aug-Sep 2026 nowcast estimated, built 2026-09-23; forecast built 2026-09-22. Solid orange shading marks months with modeled maintenance on this series. Series: Horizon (CNRL).
Actuals (AER)Nowcast (model est.)Forecast (model)Modeled maintenance month
Horizon (CNRL) monthly production Horizon (CNRL) monthly production kb/d 0.0 125.0 250.0 375.0 500.0 Aug 25: 270.6 kb/d Sep 25: 260.7 kb/d Oct 25: 279.8 kb/d Nov 25: 309.8 kb/d Dec 25: 292.7 kb/d Jan 26: 261.1 kb/d Feb 26: 273.2 kb/d Mar 26: 247.5 kb/d Apr 26: 288.4 kb/d May 26: 285.3 kb/d Aug 26: 295.5 kb/d Sep 26: 287.6 kb/d Oct 26: 308.5 kb/d Nov 26: 317.8 kb/d Dec 26: 315.6 kb/d Jan 27: 265.5 kb/d Feb 27: 283.8 kb/d Mar 27: 290.7 kb/d Apr 27: 303.1 kb/d May 27: 175.2 kb/d Jun 27: 215.7 kb/d Jul 27: 320.9 kb/d Aug 27: 301.8 kb/d Sep 27: 293.9 kb/d 293.9 Aug 25 Oct 25 Dec 25 Feb 26 Apr 26 Jun 26 Aug 26 Oct 26 Dec 26 Feb 27 Apr 27 Jun 27 Aug 27 Sep 27
Vintage: AER ST53 actuals through 2026-07 (ST39 through 2026-05), pulled 2026-09-22; Aug-Sep 2026 nowcast estimated, built 2026-09-23; forecast built 2026-09-22. Solid orange shading marks months with modeled maintenance on this series. Series: Horizon (CNRL).
Actuals (AER)Nowcast (model est.)Forecast (model)Modeled maintenance month
Latest actuals (kb/d)
SeriesFeb 2026Mar 2026Apr 2026May 2026Jun 2026Jul 2026
Horizon (CNRL)303.9287.1313.3333.3n/an/a
Horizon (CNRL)273.2247.5288.4285.3n/an/a
First forecast months (kb/d)
SeriesOct 2026Nov 2026Dec 2026Jan 2027Feb 2027Mar 2027
Horizon (CNRL)217.9345.6348.1295.6310.3318.7
Horizon (CNRL)308.5317.8315.6265.5283.8290.7

Full 26-month table with drill-down lives in the trading dashboard. Blank cells are months AER has not published yet, not zeros.

How to read Horizon (CNRL): Canadian Natural Resources Limited facility. Actuals through 2026-05; Jun-Jul 2026 are blank until AER publishes them. The forecast repeats this plant's own seasonality; the pro-rata scaling only changes the level so the drill-down ties to the approved aggregate. Maintenance modeled down at this leaf: Horizon 35-day turnaround (started Sep 8 2026). Sep 2026 -230 kb/d (September bridge per editorial ruling 2026-09-22 on CNRL 2026 budget guidance); Oct 2026 -119 kb/d (Oct 1-12 residual tail). Source: CNRL 2026 budget (2025-12-16) + editorial ruling 2026-09-22. The Maintenance offline memo row shows the same outage for reference; it is not subtracted again.

How to read Horizon (CNRL): Canadian Natural Resources Limited facility. Actuals through 2026-05; Jun-Jul 2026 are blank until AER publishes them. The forecast repeats this plant's own seasonality; the pro-rata scaling only changes the level so the drill-down ties to the approved aggregate. Growth modeled up at this leaf: Horizon NRUTT (Naphtha Recovery Unit Tailings Treatment) +6.3 kb/d SCO step change for Jul-Sep 2027, the Q3/27 months in the forecast window. Source: CNRL 2026 budget news release (2025-12-16). Approved 2026-09-23. The implied ~277,300 bbl/d post-NRUTT nameplate is not used: demonstrated ST39 peak is 309.8 kb/d SCO (2025-11) and history wins, so only the +6.3 increment is modeled.

Maintenance

In the model math

Forward calendar (Oct 2026 to Sep 2027)

TimingEventImpact kb/dStandingSource
turnaround_horizon_sep_oct_202635-day turnaround began 2026-09-08, ~-29 kb/d annualized (CNRL Q2 2026 results); runs to ~2026-10-12, overlapping the window Oct 1-12. In offline_barrels.yaml.in offline_barrels.yamlIn model mathSee note
2028 (year precision)Scheduled (future window)not stated (null, never estimated)Guidance sourcedCanadian Natural Resources Limited, 2026 Budget press release (2025-12-16)

Pattern-indicated entries are indicators only: they carry no volume and never enter model math. Math requires public-confirmed guidance.

Outlook

Named assumptions: Canadian Natural Resources Limited facility. Actuals through 2026-05; Jun-Jul 2026 are blank until AER publishes them. The forecast repeats this plant's own seasonality; the pro-rata scaling only changes the level so the drill-down ties to the approved aggregate. Maintenance modeled down at this leaf: Horizon 35-day turnaround (started Sep 8 2026). Sep 2026 -230 kb/d (September bridge per editorial ruling 2026-09-22 on CNRL 2026 budget guidance); Oct 2026 -119 kb/d (Oct 1-12 residual tail). Source: CNRL 2026 budget (2025-12-16) + editorial ruling 2026-09-22. The Maintenance offline memo row shows the same outage for reference; it is not subtracted again.

Named assumptions: Canadian Natural Resources Limited facility. Actuals through 2026-05; Jun-Jul 2026 are blank until AER publishes them. The forecast repeats this plant's own seasonality; the pro-rata scaling only changes the level so the drill-down ties to the approved aggregate. Growth modeled up at this leaf: Horizon NRUTT (Naphtha Recovery Unit Tailings Treatment) +6.3 kb/d SCO step change for Jul-Sep 2027, the Q3/27 months in the forecast window. Source: CNRL 2026 budget news release (2025-12-16). Approved 2026-09-23. The implied ~277,300 bbl/d post-NRUTT nameplate is not used: demonstrated ST39 peak is 309.8 kb/d SCO (2025-11) and history wins, so only the +6.3 increment is modeled.

Confirmation status: model forecast; maintenance impacts enter the math only from public-confirmed guidance.

Market relevance

Horizon SCO averages 282.7 kb/d over the forecast. Horizon has no documented third-party interconnect, so the model dials mine and upgrader back together during turnarounds: SCO supply tightens one-for-one with the modeled outage. Modeled maintenance peaks at Oct 2026 (+119.0 kb/d).

Basis: model-derived from the dashboard series above; no external view is added.

Related weekly notes

Sources

Horizon (CNRL)
Source: AER ST39, oil-sands plant data (mined bitumen and SCO by facility)
Vintage: AER ST39 actuals through 2026-05, pulled 2026-09-22; forecast model _seasonal_baseline, built 2026-09-22; model nowcast (_seasonal_baseline + confirmed maintenance), built 2026-09-23
Method: actuals: ST39 plant reported. forecast: seasonal baseline, scaled pro-rata to tie to the ST3 mined bitumen line. Confirmed maintenance is deducted at this leaf after the baseline (see Why).

Horizon (CNRL)
Source: AER ST39, oil-sands plant data (mined bitumen and SCO by facility)
Vintage: AER ST39 actuals through 2026-05, pulled 2026-09-22; forecast model _seasonal_baseline, built 2026-09-22; model nowcast (_seasonal_baseline + confirmed maintenance), built 2026-09-23
Method: actuals: ST39 plant reported. forecast: seasonal baseline, scaled pro-rata to tie to the ST3 upgraded production (SCO) line.

Full citation block

Sources
PublisherDatasetURLPublishedVintage / coverageRetrieved
Alberta Energy RegulatorST3: Alberta Energy Resource Industries Monthly Statisticshttps://www.aer.ca/data-and-performance/data-and-publications/statistical-reports/st3MonthlyActuals through 2026-07 (latest file vintage 2026-08-27)2026-09-22
Alberta Energy RegulatorST53: In-situ project data (BITUMEN sheet)https://www.aer.ca/data-and-performance/data-and-publications/statistical-reports/st53MonthlyActuals through 2026-072026-09-22
Alberta Energy RegulatorST39: Mine and upgrader facility dataURL not recorded in repoMonthlyActuals through 2026-052026-09-22
Canada Energy RegulatorPipeline throughput, capacity and apportionment (open data)https://www.cer-rec.gc.ca/open/energy/throughput-capacity/Monthly, ~3-month lagJan 2018 to Jun 20262026-09-22
Company disclosuresQuarterlies, budget releases, investor presentations, earnings callsURLs per record in annotations/maintenance_forward.yamlAs publishedForward maintenance calendar window 2026-10-01 to 2027-09-30, compiled 2026-09-222026-09-22
Heavy Reading modelWCSB S&D dashboard build (21 granular leaves, grade layer, maintenance math)No public URL (repo build)Per buildForecast built 2026-09-22; Aug-Sep 2026 nowcast built 2026-09-232026-09-23

Every number on this page traces to a row above. Anything missing its own source line is flagged in place; nothing ships with an unsourced number.

Heavy Reading · the WCSB supply letter.
Public information only: AER ST3/ST39/ST53 and company disclosures via the WCSB S&D model. Nothing here is licensed data, so this page renders the same with or without ?public=1.