Projects / Orion

Orion

Strathcona Resources Ltd.
No modeled maintenance in the forward windowSAGDSCR

OperatorStrathcona Resources Ltd.
TypeSAGD
TickerSCR
ST53 schemeOrion
DescriptionOrion is a steam-assisted gravity drainage (SAGD) oil sands project operated by Strathcona Resources Ltd. in the Cold Lake region. Public disclosure is thin; Strathcona is privately held.
Source: Strathcona Resources corporate presentation, March 2024
StatusOperating.
Nameplate capacitynot disclosed in reviewed sources
Start-up / phasesnot tracked in the public data used here
Ownership / JV splitStrathcona Resources Ltd. operates Orion. Ownership percentages were not disclosed in reviewed sources.
Product and dispositionBitumen: flexible disposition, dilbit to market or upgrader feed (economically optimized)
Source: Dashboard grade-layer panel (leaf mapping lineage); disposition defaults from annotations/maintenance_disposition_history.md
Process / technologySAGD.
Source: Strathcona Resources corporate presentation, March 2024
Froth treatmentnot applicable (in-situ / upgrading)
Interconnectsnot tracked in the public data used here
Growth / expansionsA waste-heat recovery project at Orion was expected to reduce operating costs by about C$2/bbl.
Source: Strathcona Resources corporate presentation, March 2024
Company-disclosed maintenancenot disclosed in reviewed sources
Operating costsPer-barrel operating cost: not disclosed. The waste-heat recovery project was expected to reduce Orion operating costs by about C$2/bbl.
Source: Strathcona Resources corporate presentation, March 2024

Blank "not tracked" cells are facts not present in the public data used here. They are labeled, never estimated. Filing-sourced facts carry their document name and date; where sources disclose multiple bases for one figure, all are shown.

Production

28.4 kb/d
latest actual, Jul 2026 (Orion (Strathcona))
28.4 kb/d
12-month forecast average, Oct 2026 to Sep 2027
Orion (Strathcona) monthly production Orion (Strathcona) monthly production kb/d 0.0 12.5 25.0 37.5 50.0 Aug 25: 24.1 kb/d Sep 25: 28.7 kb/d Oct 25: 31.7 kb/d Nov 25: 29.6 kb/d Dec 25: 29.8 kb/d Jan 26: 28.9 kb/d Feb 26: 29.1 kb/d Mar 26: 28.0 kb/d Apr 26: 28.1 kb/d May 26: 27.1 kb/d Jun 26: 27.8 kb/d Jul 26: 28.4 kb/d Aug 26: 28.1 kb/d Sep 26: 29.4 kb/d Oct 26: 31.2 kb/d Nov 26: 29.1 kb/d Dec 26: 30.1 kb/d Jan 27: 27.0 kb/d Feb 27: 26.5 kb/d Mar 27: 27.1 kb/d Apr 27: 28.0 kb/d May 27: 28.4 kb/d Jun 27: 28.4 kb/d Jul 27: 28.0 kb/d Aug 27: 28.0 kb/d Sep 27: 29.4 kb/d 29.4 Aug 25 Oct 25 Dec 25 Feb 26 Apr 26 Jun 26 Aug 26 Oct 26 Dec 26 Feb 27 Apr 27 Jun 27 Aug 27 Sep 27
Vintage: AER ST53 actuals through 2026-07 (ST39 through 2026-05), pulled 2026-09-22; Aug-Sep 2026 nowcast estimated, built 2026-09-23; forecast built 2026-09-22. Solid orange shading marks months with modeled maintenance on this series. Series: Orion (Strathcona).
Actuals (AER)Nowcast (model est.)Forecast (model)Modeled maintenance month
Latest actuals (kb/d)
SeriesFeb 2026Mar 2026Apr 2026May 2026Jun 2026Jul 2026
Orion (Strathcona)29.128.028.127.127.828.4
First forecast months (kb/d)
SeriesOct 2026Nov 2026Dec 2026Jan 2027Feb 2027Mar 2027
Orion (Strathcona)31.229.130.127.026.527.1

Full 26-month table with drill-down lives in the trading dashboard. Blank cells are months AER has not published yet, not zeros.

How to read Orion (Strathcona): Seasonal baseline off a 22.4 kb/d trailing-12m baseline. No 2027 turnaround statements; single-month dips are seasonal factors repeating the last 3 years.

Maintenance

No maintenance events in the current model math for this project.

No forward-calendar entries for this project in annotations/maintenance_forward.yaml.

Outlook

Named assumptions: Seasonal baseline off a 22.4 kb/d trailing-12m baseline. No 2027 turnaround statements; single-month dips are seasonal factors repeating the last 3 years.

Confirmation status: model forecast; maintenance impacts enter the math only from public-confirmed guidance.

Market relevance

In-situ bitumen has flexible disposition (dilbit to market or upgrader feed). In the model, Orion output is unchanged by upgrader outages and any upgrader-bound share is assumed diverted to dilbit, so its 28.4 kb/d 12-month forecast average is a steady contributor to marketable dilbit across the tradable window.

Basis: model-derived from the dashboard series above; no external view is added.

Related weekly notes

No weekly edition to date mentions this asset by name.

Sources

Orion (Strathcona)
Source: AER ST53, commercial scheme mapping (repo annotations/projects.yaml)
Vintage: AER ST53 actuals through 2026-07, pulled 2026-09-22; model nowcast (_seasonal_baseline + confirmed maintenance), built 2026-09-23
Method: actuals: ST53 scheme observed, grossed up by 1.27 to ST3 in-situ level (mapped projects cover 79.0%). forecast: _seasonal_baseline (trailing-12m mean x seasonal factor from last 3 complete years).

Full citation block

Sources
PublisherDatasetURLPublishedVintage / coverageRetrieved
Alberta Energy RegulatorST3: Alberta Energy Resource Industries Monthly Statisticshttps://www.aer.ca/data-and-performance/data-and-publications/statistical-reports/st3MonthlyActuals through 2026-07 (latest file vintage 2026-08-27)2026-09-22
Alberta Energy RegulatorST53: In-situ project data (BITUMEN sheet)https://www.aer.ca/data-and-performance/data-and-publications/statistical-reports/st53MonthlyActuals through 2026-072026-09-22
Alberta Energy RegulatorST39: Mine and upgrader facility dataURL not recorded in repoMonthlyActuals through 2026-052026-09-22
Canada Energy RegulatorPipeline throughput, capacity and apportionment (open data)https://www.cer-rec.gc.ca/open/energy/throughput-capacity/Monthly, ~3-month lagJan 2018 to Jun 20262026-09-22
Company disclosuresQuarterlies, budget releases, investor presentations, earnings callsURLs per record in annotations/maintenance_forward.yamlAs publishedForward maintenance calendar window 2026-10-01 to 2027-09-30, compiled 2026-09-222026-09-22
Heavy Reading modelWCSB S&D dashboard build (21 granular leaves, grade layer, maintenance math)No public URL (repo build)Per buildForecast built 2026-09-22; Aug-Sep 2026 nowcast built 2026-09-232026-09-23

Every number on this page traces to a row above. Anything missing its own source line is flagged in place; nothing ships with an unsourced number.

Heavy Reading · the WCSB supply letter.
Public information only: AER ST3/ST39/ST53 and company disclosures via the WCSB S&D model. Nothing here is licensed data, so this page renders the same with or without ?public=1.