Projects / Sunrise

Sunrise

Cenovus Energy Inc.
No modeled maintenance in the forward windowSAGDCVE

OperatorCenovus Energy Inc.
TypeSAGD
TickerCVE
ST53 schemeSunrise
DescriptionSunrise is a steam-assisted gravity drainage (SAGD) oil sands project in northeast Alberta producing diluted bitumen. Cenovus acquired full ownership from bp in 2022 and has been applying its oil sands operating model to raise output beyond original nameplate.
Source: Cenovus Energy, Cenovus acquiring outstanding 50% interest in Sunrise oil sands asset, 2022-06-13
StatusOperating.
Nameplate capacityNameplate capacity of 60,000 bbl/d of bitumen at the time of the 2022 acquisition, with Cenovus expecting to achieve it through a multi-year development program.
Source: Cenovus Energy, Cenovus acquiring outstanding 50% interest in Sunrise oil sands asset, 2022-06-13
Start-up / phasesnot tracked in the public data used here
Ownership / JV splitCenovus Energy Inc. owns 100% and operates Sunrise. Cenovus announced on June 13, 2022 that it had reached an agreement to purchase the remaining 50% of the Sunrise oil sands project from bp for $600 million in cash plus a variable payment and Cenovus's 35% position in the undeveloped Bay du Nord project offshore Newfoundland and Labrador. The transaction had an effective date of May 1, 2022 and was anticipated to close in Q3 2022. Cenovus had operated Sunrise since the beginning of 2021 following the Husky Energy transaction.
Source: Cenovus Energy, Cenovus acquiring outstanding 50% interest in Sunrise oil sands asset, 2022-06-13
Product and dispositionBitumen: flexible disposition, dilbit to market or upgrader feed (economically optimized)
Source: Dashboard grade-layer panel (leaf mapping lineage); disposition defaults from annotations/maintenance_disposition_history.md
Process / technologySAGD.
Source: Oil Sands Magazine, Cenovus outlines optimization plans for its SAGD assets, 2023-07-27
Froth treatmentnot applicable (in-situ / upgrading)
Interconnectsnot tracked in the public data used here
Growth / expansionsCenovus targets Sunrise output of approximately 70,000 bbl/d by 2028. CONFIRMED by primary corporate disclosure: "production continues to ramp up towards 70,000 bbls/d by 2028"; the first of four new well pads on the east development area began producing in April 2026, with a second pad expected online later in 2026.
Source: Cenovus Energy, Cenovus announces first-quarter 2026 results news release, 2026-05-06

APPLIED to the model 2026-09-23 (the editor): the cve_sunrise project leaf is held at 70.0 kb/d flat across all forecast months (Oct 2026-Sep 2027), replacing the declining seasonal baseline. Current output ~68 kb/d (ST53, 2026-07).
Cenovus stated in 2022 that applying its operating techniques should increase Sunrise production while driving down sustaining capital, operating costs, and emissions intensity.
Source: Cenovus Energy, Cenovus acquiring outstanding 50% interest in Sunrise oil sands asset, 2022-06-13
Company-disclosed maintenanceThe turnaround interval at Sunrise was increased from four years to five years, and the next major turnaround is not expected until 2030. Note: secondary-sourced from an earnings-call recap; primary-source confirmation recommended.
Source: The Cerbat Gem, Cenovus Energy Q4 earnings call highlights, 2026-02-19
Operating costsnot disclosed in reviewed sources

Blank "not tracked" cells are facts not present in the public data used here. They are labeled, never estimated. Filing-sourced facts carry their document name and date; where sources disclose multiple bases for one figure, all are shown.

Production

86.2 kb/d
latest actual, Jul 2026 (Sunrise (Cenovus))
70.0 kb/d
12-month forecast average, Oct 2026 to Sep 2027
Sunrise (Cenovus) monthly production Sunrise (Cenovus) monthly production kb/d 0.0 25.0 50.0 75.0 100.0 Aug 25: 74.9 kb/d Sep 25: 48.6 kb/d Oct 25: 75.7 kb/d Nov 25: 77.6 kb/d Dec 25: 76.0 kb/d Jan 26: 76.1 kb/d Feb 26: 76.1 kb/d Mar 26: 65.2 kb/d Apr 26: 74.7 kb/d May 26: 83.6 kb/d Jun 26: 80.6 kb/d Jul 26: 86.2 kb/d Aug 26: 80.6 kb/d Sep 26: 69.6 kb/d Oct 26: 70.0 kb/d Nov 26: 70.0 kb/d Dec 26: 70.0 kb/d Jan 27: 70.0 kb/d Feb 27: 70.0 kb/d Mar 27: 70.0 kb/d Apr 27: 70.0 kb/d May 27: 70.0 kb/d Jun 27: 70.0 kb/d Jul 27: 70.0 kb/d Aug 27: 70.0 kb/d Sep 27: 70.0 kb/d 70.0 Aug 25 Oct 25 Dec 25 Feb 26 Apr 26 Jun 26 Aug 26 Oct 26 Dec 26 Feb 27 Apr 27 Jun 27 Aug 27 Sep 27
Vintage: AER ST53 actuals through 2026-07 (ST39 through 2026-05), pulled 2026-09-22; Aug-Sep 2026 nowcast estimated, built 2026-09-23; forecast built 2026-09-22. Solid orange shading marks months with modeled maintenance on this series. Series: Sunrise (Cenovus).
Actuals (AER)Nowcast (model est.)Forecast (model)Modeled maintenance month
Latest actuals (kb/d)
SeriesFeb 2026Mar 2026Apr 2026May 2026Jun 2026Jul 2026
Sunrise (Cenovus)76.165.274.783.680.686.2
First forecast months (kb/d)
SeriesOct 2026Nov 2026Dec 2026Jan 2027Feb 2027Mar 2027
Sunrise (Cenovus)70.070.070.070.070.070.0

Full 26-month table with drill-down lives in the trading dashboard. Blank cells are months AER has not published yet, not zeros.

How to read Sunrise (Cenovus): Choppy seasonal shape; May dip to 50.1 is seasonal. No Sunrise-specific 2027 maintenance stated. Growth modeled at this leaf: Sunrise held at 70.0 kb/d flat across forecast months (replaces the declining seasonal baseline). Source: Cenovus Q1 2026 results news release (2026-05-06): production ramping towards 70,000 bbl/d by 2028. Approved 2026-09-23.

Maintenance

No maintenance events in the current model math for this project.

Forward calendar (Oct 2026 to Sep 2027)

TimingEventImpact kb/dStandingSource
Oct 2026 to Dec 2026 (quarter precision)No turnaround in window (stated)not stated (null, never estimated)Guidance sourcedCenovus Energy Inc., Cenovus announces second-quarter 2026 results (2026-07-29)

Pattern-indicated entries are indicators only: they carry no volume and never enter model math. Math requires public-confirmed guidance.

Outlook

Named assumptions: Choppy seasonal shape; May dip to 50.1 is seasonal. No Sunrise-specific 2027 maintenance stated. Growth modeled at this leaf: Sunrise held at 70.0 kb/d flat across forecast months (replaces the declining seasonal baseline). Source: Cenovus Q1 2026 results news release (2026-05-06): production ramping towards 70,000 bbl/d by 2028. Approved 2026-09-23.

Confirmation status: model forecast; maintenance impacts enter the math only from public-confirmed guidance.

Market relevance

In-situ bitumen has flexible disposition (dilbit to market or upgrader feed). In the model, Sunrise output is unchanged by upgrader outages and any upgrader-bound share is assumed diverted to dilbit, so its 70.0 kb/d 12-month forecast average is a steady contributor to marketable dilbit across the tradable window.

Basis: model-derived from the dashboard series above; no external view is added.

Related weekly notes

No weekly edition to date mentions this asset by name.

Sources

Sunrise (Cenovus)
Source: AER ST53, commercial scheme mapping (repo annotations/projects.yaml)
Vintage: AER ST53 actuals through 2026-07, pulled 2026-09-22; model nowcast (_seasonal_baseline + confirmed maintenance), built 2026-09-23
Method: actuals: ST53 scheme observed, grossed up by 1.27 to ST3 in-situ level (mapped projects cover 79.0%). forecast: _seasonal_baseline (trailing-12m mean x seasonal factor from last 3 complete years).

Full citation block

Sources
PublisherDatasetURLPublishedVintage / coverageRetrieved
Alberta Energy RegulatorST3: Alberta Energy Resource Industries Monthly Statisticshttps://www.aer.ca/data-and-performance/data-and-publications/statistical-reports/st3MonthlyActuals through 2026-07 (latest file vintage 2026-08-27)2026-09-22
Alberta Energy RegulatorST53: In-situ project data (BITUMEN sheet)https://www.aer.ca/data-and-performance/data-and-publications/statistical-reports/st53MonthlyActuals through 2026-072026-09-22
Alberta Energy RegulatorST39: Mine and upgrader facility dataURL not recorded in repoMonthlyActuals through 2026-052026-09-22
Canada Energy RegulatorPipeline throughput, capacity and apportionment (open data)https://www.cer-rec.gc.ca/open/energy/throughput-capacity/Monthly, ~3-month lagJan 2018 to Jun 20262026-09-22
Company disclosuresQuarterlies, budget releases, investor presentations, earnings callsURLs per record in annotations/maintenance_forward.yamlAs publishedForward maintenance calendar window 2026-10-01 to 2027-09-30, compiled 2026-09-222026-09-22
Heavy Reading modelWCSB S&D dashboard build (21 granular leaves, grade layer, maintenance math)No public URL (repo build)Per buildForecast built 2026-09-22; Aug-Sep 2026 nowcast built 2026-09-232026-09-23

Every number on this page traces to a row above. Anything missing its own source line is flagged in place; nothing ships with an unsourced number.

Heavy Reading · the WCSB supply letter.
Public information only: AER ST3/ST39/ST53 and company disclosures via the WCSB S&D model. Nothing here is licensed data, so this page renders the same with or without ?public=1.