Turnaround in model: Oct 2026 (+10.1 kb/d, Syncrude Coker 8-2 mine dial-back)Integrated (mine + upgrader)SU

OperatorSyncrude Canada Ltd.
TypeIntegrated (mine + upgrader)
TickerSU
ST53 schemenot in ST53
DescriptionSyncrude is an integrated oil sands mining and upgrading joint venture in the Athabasca region (Mildred Lake and Aurora mines, upgrader). Suncor assumed operatorship in October 2021. Mined bitumen is upgraded on site to synthetic crude oil (SCO).
Source: International Mining, Suncor officially takes over operatorship of Syncrude Joint Venture, 2021-10-08
StatusOperating.
Nameplate capacityGross SCO capacity of about 350,000 bbl/d.
Source: JX Nippon Oil and Gas Exploration, Summary of Syncrude Oil Sand Project, 2026-09-23
Source: Oil and Gas Journal, Suncor buys Mocal Energy's Syncrude stake, 2018-02-12

Suncor reports its share of upgrader capacity as 206,000 bbl/d, net to its 58.74% working interest (206,000 / 0.5874 implies about 350,700 bbl/d gross; the company does not state the gross figure, so record both bases without treating them as a conflict).
Source: Suncor Energy, Q4 2025 investor presentation

Syncrude gross production averaged 323,000 bbl/d in 2023 (190,000 bbl/d net to Suncor).
Source: Suncor Energy, Suncor Energy achieves 2023 upstream production corporate guidance, 2024-01-03
Start-up / phasesnot tracked in the public data used here
Ownership / JV splitThe joint venture partners are Suncor Energy Inc. (58.74%), Imperial Oil Resources Limited (25.0%), Sinopec Oil Sands Partnership (9.03%), and CNOOC Oil Sands Canada (7.23%). Suncor's interest grew from 53.74% to 58.74% when it closed the purchase of Mocal Energy's 5% interest on February 26, 2018, effective January 1, 2018. Suncor is the operator (since October 2021).
Source: Suncor Energy, Suncor Energy closes purchase of additional interest in Syncrude, via GlobeNewswire/BOE Report, 2018-02-26
Source: International Mining, Suncor officially takes over operatorship of Syncrude Joint Venture, 2021-10-08
Product and dispositionSCO from the upgrader; mined bitumen to the upgrader (froth treatment NFT: upgrader-locked, cannot meet pipeline dilbit spec)
Source: annotations/maintenance_disposition_history.md
Process / technologyOpen-pit mining with naphtha froth treatment (NFT); mined bitumen is upgrader-locked and is upgraded on site to SCO. Note: NFT classification is secondary-sourced research.
Source: project technology research compilation, 2026-09-23
Froth treatmentNFT (naphthenic froth treatment): upgrader-locked
Source: annotations/maintenance_disposition_history.md
InterconnectsSuncor-Syncrude bi-directional interconnects (in service ~2020/21): bitumen can flow either way
Source: annotations/maintenance_disposition_history.md
Growth / expansionsNo sanctioned expansion disclosed in reviewed sources.
Company-disclosed maintenanceSuncor's 2026 corporate guidance disclosed maintenance at Syncrude with a quarterly production and cost effect.
Source: Suncor Energy, Suncor Energy announces 2026 corporate guidance, 2025-12-11

A planned turnaround at Syncrude in Q2 2026 was disclosed in Imperial Oil's 2026 guidance; Imperial's 2026 Syncrude production guidance is 78,000 to 82,000 bbl/d (Imperial share).
Source: Imperial Oil, Imperial provides 2026 corporate guidance outlook, via Business Wire, 2025-12-15

The Q1 2026 Syncrude coker outage demonstrated the interconnect playbook: 16,400 bbl/d of Syncrude bitumen and 66,900 bbl/d of Fort Hills bitumen were transferred to Suncor Base, with the Base upgrader running at 108% utilization.
Source: Suncor Energy Q1 2026 Form 6-K, via StockTitan, 2026-05
Operating costs2026 cost guidance of $34 to $37/bbl, net to Suncor's 58.74% share.
Source: Suncor Energy, Suncor Energy announces 2026 corporate guidance, 2025-12-11

Imperial Oil reported Q2 2026 unit cash cost of C$57.81/bbl for its Syncrude share.
Source: Investing News, Imperial announces second quarter 2026 financial and operating results, 2026-07-31

Blank "not tracked" cells are facts not present in the public data used here. They are labeled, never estimated. Filing-sourced facts carry their document name and date; where sources disclose multiple bases for one figure, all are shown.

Production

153.1 kb/d
latest actual, May 2026 (Syncrude Mildred Lake)
170.6 kb/d
12-month forecast average, Oct 2026 to Sep 2027
Syncrude Mildred Lake monthly production Syncrude Mildred Lake monthly production kb/d 0.0 62.5 125.0 187.5 250.0 Aug 25: 203.8 kb/d Sep 25: 132.4 kb/d Oct 25: 153.1 kb/d Nov 25: 215.3 kb/d Dec 25: 234.7 kb/d Jan 26: 173.2 kb/d Feb 26: 118.2 kb/d Mar 26: 195.4 kb/d Apr 26: 158.7 kb/d May 26: 153.1 kb/d Aug 26: 181.3 kb/d Sep 26: 123.9 kb/d Oct 26: 161.3 kb/d Nov 26: 196.6 kb/d Dec 26: 203.1 kb/d Jan 27: 172.4 kb/d Feb 27: 170.7 kb/d Mar 27: 166.3 kb/d Apr 27: 146.5 kb/d May 27: 128.8 kb/d Jun 27: 170.2 kb/d Jul 27: 178.2 kb/d Aug 27: 194.7 kb/d Sep 27: 158.6 kb/d 158.6 Aug 25 Oct 25 Dec 25 Feb 26 Apr 26 Jun 26 Aug 26 Oct 26 Dec 26 Feb 27 Apr 27 Jun 27 Aug 27 Sep 27
Vintage: AER ST53 actuals through 2026-07 (ST39 through 2026-05), pulled 2026-09-22; Aug-Sep 2026 nowcast estimated, built 2026-09-23; forecast built 2026-09-22. Solid orange shading marks months with modeled maintenance on this series. Series: Syncrude Mildred Lake.
Actuals (AER)Nowcast (model est.)Forecast (model)Modeled maintenance month
Syncrude Aurora monthly production Syncrude Aurora monthly production kb/d 0.0 62.5 125.0 187.5 250.0 Aug 25: 216.4 kb/d Sep 25: 188.5 kb/d Oct 25: 200.0 kb/d Nov 25: 221.2 kb/d Dec 25: 215.4 kb/d Jan 26: 220.5 kb/d Feb 26: 183.8 kb/d Mar 26: 177.9 kb/d Apr 26: 188.0 kb/d May 26: 211.3 kb/d Aug 26: 217.2 kb/d Sep 26: 199.0 kb/d Oct 26: 197.9 kb/d Nov 26: 230.2 kb/d Dec 26: 238.1 kb/d Jan 27: 203.5 kb/d Feb 27: 193.7 kb/d Mar 27: 225.1 kb/d Apr 27: 143.4 kb/d May 27: 209.0 kb/d Jun 27: 226.9 kb/d Jul 27: 215.9 kb/d Aug 27: 217.2 kb/d Sep 27: 199.0 kb/d 199.0 Aug 25 Oct 25 Dec 25 Feb 26 Apr 26 Jun 26 Aug 26 Oct 26 Dec 26 Feb 27 Apr 27 Jun 27 Aug 27 Sep 27
Vintage: AER ST53 actuals through 2026-07 (ST39 through 2026-05), pulled 2026-09-22; Aug-Sep 2026 nowcast estimated, built 2026-09-23; forecast built 2026-09-22. Solid orange shading marks months with modeled maintenance on this series. Series: Syncrude Aurora.
Actuals (AER)Nowcast (model est.)Forecast (model)Modeled maintenance month
Syncrude Mildred Lake monthly production Syncrude Mildred Lake monthly production kb/d 0.0 125.0 250.0 375.0 500.0 Aug 25: 362.5 kb/d Sep 25: 262.5 kb/d Oct 25: 296.7 kb/d Nov 25: 395.5 kb/d Dec 25: 381.5 kb/d Jan 26: 306.3 kb/d Feb 26: 245.3 kb/d Mar 26: 274.9 kb/d Apr 26: 345.0 kb/d May 26: 322.8 kb/d Aug 26: 327.7 kb/d Sep 26: 236.5 kb/d Oct 26: 296.2 kb/d Nov 26: 369.2 kb/d Dec 26: 374.7 kb/d Jan 27: 328.9 kb/d Feb 27: 332.0 kb/d Mar 27: 331.9 kb/d Apr 27: 240.2 kb/d May 27: 268.3 kb/d Jun 27: 356.5 kb/d Jul 27: 355.0 kb/d Aug 27: 357.5 kb/d Sep 27: 313.5 kb/d 313.5 Aug 25 Oct 25 Dec 25 Feb 26 Apr 26 Jun 26 Aug 26 Oct 26 Dec 26 Feb 27 Apr 27 Jun 27 Aug 27 Sep 27
Vintage: AER ST53 actuals through 2026-07 (ST39 through 2026-05), pulled 2026-09-22; Aug-Sep 2026 nowcast estimated, built 2026-09-23; forecast built 2026-09-22. Solid orange shading marks months with modeled maintenance on this series. Series: Syncrude Mildred Lake.
Actuals (AER)Nowcast (model est.)Forecast (model)Modeled maintenance month
Latest actuals (kb/d)
SeriesFeb 2026Mar 2026Apr 2026May 2026Jun 2026Jul 2026
Syncrude Mildred Lake118.2195.4158.7153.1n/an/a
Syncrude Aurora183.8177.9188.0211.3n/an/a
Syncrude Mildred Lake245.3274.9345.0322.8n/an/a
First forecast months (kb/d)
SeriesOct 2026Nov 2026Dec 2026Jan 2027Feb 2027Mar 2027
Syncrude Mildred Lake161.3196.6203.1172.4170.7166.3
Syncrude Aurora197.9230.2238.1203.5193.7225.1
Syncrude Mildred Lake296.2369.2374.7328.9332.0331.9

Full 26-month table with drill-down lives in the trading dashboard. Blank cells are months AER has not published yet, not zeros.

How to read Syncrude Mildred Lake: Syncrude Canada Ltd. facility. Actuals through 2026-05; Jun-Jul 2026 are blank until AER publishes them. The forecast repeats this plant's own seasonality; the pro-rata scaling only changes the level so the drill-down ties to the approved aggregate. Maintenance modeled down at this leaf: Syncrude Coker 8-2 mine dial-back (approved 2026-09-23). Aug 2026 -13.4, Sep 2026 -34.7, Oct 2026 -10.1 kb/d: 45% of the SCO rate (SYNCRUDE_MINE_DIALBACK_SHARE = 0.45, midpoint of the 30-60% empirical range in annotations/maintenance_disposition_history.md). The paired upgrader leaf carries the SCO deduction; the balance of the coker feed shortfall is assumed redirected via the Suncor-Syncrude interconnect (see the Suncor Base upgrader leaf). Carried at the Mildred Lake plant leaf as the complex-level mined impact; Aurora's leaf is unchanged.

How to read Syncrude Aurora: Syncrude Canada Ltd. facility. Actuals through 2026-05; Jun-Jul 2026 are blank until AER publishes them. The forecast repeats this plant's own seasonality; the pro-rata scaling only changes the level so the drill-down ties to the approved aggregate.

How to read Syncrude Mildred Lake: Syncrude Canada Ltd. facility. Actuals through 2026-05; Jun-Jul 2026 are blank until AER publishes them. The forecast repeats this plant's own seasonality; the pro-rata scaling only changes the level so the drill-down ties to the approved aggregate. Maintenance modeled down at this leaf: Syncrude Coker 8-2 turnaround (planned start Aug 20 2026, about 50 days). Aug 2026 -29.8 kb/d (Aug 20-31, 77 x 12/31), Sep 2026 -77.0 kb/d (full month), Oct 2026 -22.4 kb/d (Oct 1-9 tail, 77 x 9/31). Source: Suncor Q2 2026 MD&A (2026-08-04), Q1 2026 investor presentation. The paired mined-bitumen leaf dials back at 45% of the SCO rate and Suncor Base's upgrader leaf carries the interconnect redirect as a positive SCO offset (see those leaves).

Maintenance

In the model math

Forward calendar (Oct 2026 to Sep 2027)

TimingEventImpact kb/dStandingSource
turnaround_syncrude_q3_2026Coker 8-2 turnaround planned start 2026-08-20, ~50 days (Suncor Q2 2026 call; deferred from Q2 per Imperial Q2 2026 call), running to ~2026-10-09, overlapping the window Oct 1-9. In offline_barrels.yaml. Paired disposition (mine dial-back 45%, Base redirect offset) approved 2026-09-23: see disposition_coker82_2026 in offline_barrels.yaml.in offline_barrels.yamlIn model mathSee note

Pattern-indicated entries are indicators only: they carry no volume and never enter model math. Math requires public-confirmed guidance.

Outlook

Named assumptions: Syncrude Canada Ltd. facility. Actuals through 2026-05; Jun-Jul 2026 are blank until AER publishes them. The forecast repeats this plant's own seasonality; the pro-rata scaling only changes the level so the drill-down ties to the approved aggregate. Maintenance modeled down at this leaf: Syncrude Coker 8-2 mine dial-back (approved 2026-09-23). Aug 2026 -13.4, Sep 2026 -34.7, Oct 2026 -10.1 kb/d: 45% of the SCO rate (SYNCRUDE_MINE_DIALBACK_SHARE = 0.45, midpoint of the 30-60% empirical range in annotations/maintenance_disposition_history.md). The paired upgrader leaf carries the SCO deduction; the balance of the coker feed shortfall is assumed redirected via the Suncor-Syncrude interconnect (see the Suncor Base upgrader leaf). Carried at the Mildred Lake plant leaf as the complex-level mined impact; Aurora's leaf is unchanged.

Named assumptions: Syncrude Canada Ltd. facility. Actuals through 2026-05; Jun-Jul 2026 are blank until AER publishes them. The forecast repeats this plant's own seasonality; the pro-rata scaling only changes the level so the drill-down ties to the approved aggregate.

Named assumptions: Syncrude Canada Ltd. facility. Actuals through 2026-05; Jun-Jul 2026 are blank until AER publishes them. The forecast repeats this plant's own seasonality; the pro-rata scaling only changes the level so the drill-down ties to the approved aggregate. Maintenance modeled down at this leaf: Syncrude Coker 8-2 turnaround (planned start Aug 20 2026, about 50 days). Aug 2026 -29.8 kb/d (Aug 20-31, 77 x 12/31), Sep 2026 -77.0 kb/d (full month), Oct 2026 -22.4 kb/d (Oct 1-9 tail, 77 x 9/31). Source: Suncor Q2 2026 MD&A (2026-08-04), Q1 2026 investor presentation. The paired mined-bitumen leaf dials back at 45% of the SCO rate and Suncor Base's upgrader leaf carries the interconnect redirect as a positive SCO offset (see those leaves).

Confirmation status: model forecast; maintenance impacts enter the math only from public-confirmed guidance.

Market relevance

Syncrude SCO averages 327.0 kb/d over the forecast. At interconnected Suncor/Syncrude sites the model redirects part of the mine rate via the bi-directional interconnect during upgrader outages (Q1 2026 precedent), and flexible SAGD/PFT barrels tilt toward dilbit. Modeled maintenance peaks at Oct 2026 (+22.4 kb/d).

Basis: model-derived from the dashboard series above; no external view is added.

Related weekly notes

Sources

Syncrude Mildred Lake
Source: AER ST39, oil-sands plant data (mined bitumen and SCO by facility)
Vintage: AER ST39 actuals through 2026-05, pulled 2026-09-22; forecast model _seasonal_baseline, built 2026-09-22; model nowcast (_seasonal_baseline + confirmed maintenance), built 2026-09-23
Method: actuals: ST39 plant reported. forecast: seasonal baseline, scaled pro-rata to tie to the ST3 mined bitumen line. Confirmed maintenance is deducted at this leaf after the baseline (see Why).

Syncrude Aurora
Source: AER ST39, oil-sands plant data (mined bitumen and SCO by facility)
Vintage: AER ST39 actuals through 2026-05, pulled 2026-09-22; forecast model _seasonal_baseline, built 2026-09-22; model nowcast (_seasonal_baseline + confirmed maintenance), built 2026-09-23
Method: actuals: ST39 plant reported. forecast: seasonal baseline, scaled pro-rata to tie to the ST3 mined bitumen line.

Syncrude Mildred Lake
Source: AER ST39, oil-sands plant data (mined bitumen and SCO by facility)
Vintage: AER ST39 actuals through 2026-05, pulled 2026-09-22; forecast model _seasonal_baseline, built 2026-09-22; model nowcast (_seasonal_baseline + confirmed maintenance), built 2026-09-23
Method: actuals: ST39 plant reported. forecast: seasonal baseline, scaled pro-rata to tie to the ST3 upgraded production (SCO) line. Confirmed maintenance is deducted at this leaf after the baseline (see Why).

Full citation block

Sources
PublisherDatasetURLPublishedVintage / coverageRetrieved
Alberta Energy RegulatorST3: Alberta Energy Resource Industries Monthly Statisticshttps://www.aer.ca/data-and-performance/data-and-publications/statistical-reports/st3MonthlyActuals through 2026-07 (latest file vintage 2026-08-27)2026-09-22
Alberta Energy RegulatorST53: In-situ project data (BITUMEN sheet)https://www.aer.ca/data-and-performance/data-and-publications/statistical-reports/st53MonthlyActuals through 2026-072026-09-22
Alberta Energy RegulatorST39: Mine and upgrader facility dataURL not recorded in repoMonthlyActuals through 2026-052026-09-22
Canada Energy RegulatorPipeline throughput, capacity and apportionment (open data)https://www.cer-rec.gc.ca/open/energy/throughput-capacity/Monthly, ~3-month lagJan 2018 to Jun 20262026-09-22
Company disclosuresQuarterlies, budget releases, investor presentations, earnings callsURLs per record in annotations/maintenance_forward.yamlAs publishedForward maintenance calendar window 2026-10-01 to 2027-09-30, compiled 2026-09-222026-09-22
Heavy Reading modelWCSB S&D dashboard build (21 granular leaves, grade layer, maintenance math)No public URL (repo build)Per buildForecast built 2026-09-22; Aug-Sep 2026 nowcast built 2026-09-232026-09-23

Every number on this page traces to a row above. Anything missing its own source line is flagged in place; nothing ships with an unsourced number.

Heavy Reading · the WCSB supply letter.