No public-confirmed maintenance sits in the model math from Jan 2027 onward:
April 2027: Primrose/Wolf Lake CADENCE-MODELED turnaround (-26 kb/d, weak-signal flag)
September 2027: MacKay River CADENCE-MODELED turnaround (-12 kb/d)
Largest projected month-to-month supply moves:
Oct 2026 to Nov 2026: +365.0 kb/d
Dec 2026 to Jan 2027: -347.9 kb/d
May 2027 to Jun 2027: +270.9 kb/d
Implied storage change ranges from a high of -331.6 kb/d in Apr 2027 to a low of -512.2 kb/d in Feb 2027 (positive = build into commercial storage, negative = draw).
All figures kb/d, computed from the model tables. Full call: the Dashboard.
Supply, latest actual
4,398.3 kb/d
Jul 2026 · AER ST3 actual
Tradable supply, avg
4,286.2 kb/d
Nov 2026 onward
Heaviest maintenance
310.0 kb/d
Sep 2026 offline
Egress spare capacity
272.2 kb/d
Jun 2026 · CER, pulled 2026-09-22
Egress
How full the pipes are: available capacity by system against what actually flowed. The TMX expansion step is structural: the capacity series itself steps up in May 2024.
Egress is running 94% full: 272 kb/d of spare capacity in Jun 2026
Stacked available capacity by pipeline system against total throughput. Enbridge Mainline, Keystone, and Trans Mountain only: Express and rail capacity series are not in the CER dataset, so they are excluded rather than estimated. Vintage: CER open data (throughput + capacity), pulled 2026-09-22.
Download CSVCSV · CER open data (throughput + capacity), pulled 2026-09-22
Supply by type
What kind of barrel the WCSB produces: heavy, light, medium, and synthetic. The window runs from AER actuals through the nowcast into the model forecast.
Into Dec 2027: biggest add Heavy +36 kb/d; biggest drag Medium -2 kb/d
Western Canadian crude supply by tradeable type: total tradable supply as a line, with Heavy, Synthetic, Light, and Medium as grouped bars on a shared zero baseline so period-to-period changes read directly. Heavy = marketable bitumen (dilbit) + conventional heavy and ultra-heavy; Synthetic = synthetic crude oil (SCO), the upgrader output; Light includes condensate production (~100 kb/d, mostly diluent supply). Medium is the ST3 (Alberta Energy Regulator monthly statistics) density grade: the ST3 does not break out sulfur, so medium sour cannot be separated from this dataset. Vintage: AER ST3 actuals through 2026-07 (pulled 2026-09-22); Aug-Sep 2026 nowcast estimated; forecast model build 2026-09-22.
HeavySyntheticLightMediumTotal tradable supply
Download CSVCSV · AER ST3 actuals through 2026-07 (pulled 2026-09-22); Aug-Sep 2026 nowcast estimated; forecast model build 2026-09-22
Biggest movers
The largest month-over-month changes in the latest published actuals. Monthly data — this is not a weekly movers table.
A z-score measures how unusual this month's move is for that specific asset. A score of 2 means the move was about twice the asset's typical monthly swing over the past year. Big assets post big raw moves all the time, so the raw number alone misleads; the score separates a real signal from normal noise, and rows marked signal moved at least twice their normal monthly range.
Vintage: AER ST3 actuals, Jun 2026 to Jul 2026 (pulled 2026-09-22). Monthly source: these are month-over-month changes in published actuals, not weekly moves. Universe: 22 in-situ project leaves, 13 mined/upgrader plant leaves, and the 5 conventional ST3 native lines; aggregates, decomposed lines, and grade derivations are excluded so no barrel counts twice.
Maintenance outlook
Forward offline volumes from the maintenance dataset: company-stated turnarounds where they exist, cadence-modeled where they don't.
Sep 2026 is the heaviest maintenance month in the forward calendar: 310 kb/d offline
Modeled offline crude volumes by month. Event markers name the largest contributor from the maintenance dataset itself; 2027 events are cadence-modeled, not company-stated. Vintage: forward maintenance calendar 2026-09-22; modeled at the leaves 2026-09-23.
Download CSVCSV · forward maintenance calendar 2026-09-22; modeled at the leaves 2026-09-23